-
202303-31
Schneider frequency converter setup steps detailed
1. Macro Equipment:According to the control requirements of different loads, Schneider inverter defines the macro equipment and the initial function of I/O terminals.Change macro equipment, can be fix···
-
202303-24
How does the WEINVIEW touch screen connect with the Omron NJ controller?
First, Omron NJ controller programming1. Create the structure data type required by the project. For example, the Boolean switch quantity used in this example is combined to establish a structure data···
-
202303-17
Installation guide for Siemens S7--200 equipment
The S7-200 can be mounted on a panel or standard guide rail. The S7-200 can be mounted horizontally or vertically.warningSIMATIC S7-200 PLC is an open controller. It requires the S7-200 to be installe···
-
202303-08
How to choose Schneider Circuit Breaker?
First calculate the current value of each branchPure resistive load, such as light bulbs, electric heaters, etc., with the indicated power directly divided by the voltage, the formula I= power /220v; ···
-
202303-08
Cause of frequent trip of Schneider leakage switch
1. Bad deviceEach pile lead wire is not firmly connected, long-term loose, will cause the pile head heat, oxidation, burn the outer insulation of the wire, and announce the spark and coke taste, the f···
-
202303-03
MCGS touch screen 485 communication precautions
1. Variables in the real-time runtime cannot simultaneously add channels and use functions to send data.2. In the parent device of the universal serial port, COM port indicates 232 or 485. In touch, C···