Omron plc maintenance procedures and equipment regular cleaning regulations
Published:2023-02-28 16:01:38
I. Maintenance procedures, regular equipment testing and adjustment regulations
(1) Check the connection of wiring terminals in the PLC cabinet every half a year or quarter. If loose places are found, re-connect firmly in time;
(2) Measure the working voltage of the power supply to the host in the cabinet every month.
Ii. Provisions for regular cleaning of equipment
(1) Clean PLC every six months or quarter, cut off the power supply to PLC, remove the power rack, CPU motherboard and input/output board in turn, purge, clean and then install in place, restore all connections and power and start the PLC host. Carefully clean the PLC box health;
(2) Replace the filter under the power rack every three months.
-
202302-14
What fault does ABB soft starter show EF32?
What is ABB soft starter fault codes EF32.The ABB PSE series soft start is a three-phase controller with a compact design and a wide range of applications.It is mostly used in water pump motors,and th···
-
202301-17
Installation and commissioning steps of ABB robot accessories
General steps for ABB robot installation and commissioning:1. Lift the robot body and control cabinet into place2. Cable connection between ABB robot body and control cabinet3. ABB robot teaching devi···
-
202309-01
The Hikvision camera indicates that the network access is abnormal
1. Check whether the network is stable and packet loss occurs.2. Check whether IP addresses conflict.3. Check whether the power supply of the device is normal.4. Check whether the network cable and ca···
-
202303-24
How does the WEINVIEW touch screen connect with the Omron NJ controller?
First, Omron NJ controller programming1. Create the structure data type required by the project. For example, the Boolean switch quantity used in this example is combined to establish a structure data···
-
202212-30
[Gongboshi case] electric control cabinet box welding - Doctor of engineering independent brand to help customers intelligent upgrade production line
Welding of electric control cabinet cabinetIn this case, the welding robot is combined with the Doctor of engineering robot positioner and gun cleaning station to realize the automatic welding of the ···