-
202307-07
LS PLC use introduction
1, for switching quantity controlThe ability of PLC to control the switching quantity is very strong. The number of points controlled by the input and output points, as few as a dozen points, dozens o···
-
202306-30
Advantech motherboard how to enter the U disk starter
If you can access the operating system before reinstalling the industrial computer system, you should back up important data and drivers to avoid the loss of important files due to system reinstallati···
-
202306-21
Delta servo motor regular diagnosis and repair method
First, the motor temperature is too high or the smoke motor common failureReasons :1. The load is too large; 2. Two-phase operation; 3. Air duct obstruction; 4. The working temperature is too high; 5.···
-
202306-15
Schneider soft starter fault alarm maintenance method
1, Question -F 05(frequency error) :This problem is because the soft starter presents a problem when processing the internal power signal, causing a power frequency error. This situation needs to cons···
-
202306-09
ABB robot program running speed slow repair steps
1, check whether the program contains logical instructions (or other instructions that "take no time" to execute), because such programs will cause execution loops when conditions are not me···
-
202306-01
The main function and composition of the configuration software of MCGS Tong - state embedded edition are introduced
The main function of MCGS embedded configuration software1. Simple and flexible visual operation interface: all Chinese and visual development interface is adopted, which meets the usage habits and re···