Maintenance points of Omron relay
Published:2023-02-01 15:32:10
1. The shell surface of the Omron relay used in installation should be free of scratches, cracks and damage. In case of serious damage, the intact relay with the same specifications should be replaced in time;
2. In the maintenance process of Omron relay, it is necessary to check whether the contact of Omron relay is broken or bright. If abnormal situation is found, maintenance personnel should timely deal with it;
3. Carefully check whether there are foreign bodies such as welding slag and dust inside the Omron relay to avoid affecting the performance of the relay;
Four. Check whether the coil inside the Omron relay is broken, but also check whether all the connections are broken, whether the solder joint is full and wet;
5. Because the pin of relay is easy to be damaged, it is necessary to check regularly whether the pin of Omron relay has deformation, discoloration or other mechanical damage;
Vi. Check whether the fastener of Omron relay is loose. If the above phenomenon is found, the maintenance personnel should tighten it in time;
Vii. In the actual use of Omron relay, the locating pin and the base may loosen under certain circumstances, so it is necessary to check whether the locating pin and the base are consistent and whether they are loose. In the process of inspection, if loose phenomenon is found, corresponding measures should be taken in time.
-
202212-29
The composition of the configuration software of Kunlun MCGS embedded version
The user system generated by MCGS embedded version is composed of five parts: main control window, device window, user window, real-time database and operation strategy.1, the main control window: the···
-
202212-30
Nine main characteristics of Omron relays
1. Extremely small and lightweight typeOmron relay has developed and manufactured an extra small standard, the first relay profession at home and abroad, occupies a leading position in the market.2, l···
-
202309-07
YOULI Multiway valve - Multiway valve regulation method
1. Under normal conditions, before the hydraulic multiway valve leaves the factory, its opening pressure should be adjusted one by one to the setting value required by the user. If the user puts forwa···
-
202212-30
[Gongboshi case] electric control cabinet box welding - Doctor of engineering independent brand to help customers intelligent upgrade production line
Welding of electric control cabinet cabinetIn this case, the welding robot is combined with the Doctor of engineering robot positioner and gun cleaning station to realize the automatic welding of the ···
-
202302-22
Principle of abb leakage switch
The operation principle of the leakage switch is: there are two groups on an iron core: An input current winding and an output current winding, when there is no leakage, input current and output curre···