Installation and commissioning steps of ABB robot accessories
Published:2023-01-17 16:59:22
General steps for ABB robot installation and commissioning:
1. Lift the robot body and control cabinet into place
2. Cable connection between ABB robot body and control cabinet
3. ABB robot teaching device is connected with control cabinet
4. Connect to the main power supply
5, check the main power supply is normal, power on
6. Calibration operation of mechanical origin of six axes of the robot
7. Setting of 1/0 signal
8. Install tools and peripheral equipment
9. Programming and debugging
10. Put into automatic operation
Basic debugging methods/steps of abb robot accessories
1. System information Displays the relevant information of the controller and the operating system. You can view the version and option of RobotWare currently in use, the current key of the control and driver module, and the network connection.
2. The robot system needs to be restarted under the following circumstances:
1) New hardware has been installed.
2) The configuration parameters of the robot system are changed.
3) System failure (SYSFAIL)
4) The RAPID program has a program fault.
Matters needing attention
ABB robotic systems can be unmanned for long periods of time. There is no need to periodically restart a running system.
-
202301-11
Advantech industrial computer main features and use precautions
The main characteristics of Advantech industrial computer:1. Advantech industrial computer requires the ability to continuously work for a long time.2, the chassis has a special power supply, the powe···
-
202306-15
Schneider soft starter fault alarm maintenance method
1, Question -F 05(frequency error) :This problem is because the soft starter presents a problem when processing the internal power signal, causing a power frequency error. This situation needs to cons···
-
202301-09
Schneider frame circuit breaker MT circuit breaker failed to close the switch problem
Schneider structural circuit breaker has not stored energy (check the power supply of the energy storage motor, if normal check whether it can be manually stored energy)MX shunt coil live (disconnect ···
-
202308-03
Mitsubishi inverter commissioning procedure before use
First, Mitsubishi inverter no-load power test.1. Ground the ground terminal of the Mitsubishi frequency converter.2 Connect the power input terminal of the Mitsubishi inverter to the power supply thro···
-
202302-15
How to calibrate the touch screen?
If the password of the system Settings of the Verantone touch screen hardware is lost, you can restore the factory Settings by system initialization. There are four ways to enter the Willenton touch s···